Go the FUSE Home Page


arrow image FUSE Mission Overview
arrow image FUSE Science Summaries
arrow image Public Outreach
arrow image Frequently asked questions
arrow image Personnel and Partners
arrow image Photo File
arrow image Animations and Graphics
arrow image On-line stories about FUSE and Results
arrow image Press materials
arrow image FUSE Publications
arrow image Observer's News
arrow image French site link French Flag

arrow image Current Status Report
arrow image Operations
arrow image Status Report Archive
arrow image Orbital Elements


arrow image Go to the Guest Investigator (GI) Homepage
arrow image Phase 2 Proposal Information
arrow image GI Proposal Information
arrow image Observatory Programs Info
arrow image FUSE Observer's Guide
arrow image Planning Tools
arrow image FUSE Data Archive
arrow image Data Analysis
arrow image Mission Planning Schedule Plots page
arrow image Visitor Information

Contact the FUSE Webmasters


FUSE Mission Status Report

Mission Status Report #69      Star Date: June 23, 2003

FUSE Completes Four Years in Orbit!

Caption: Graphic showing how FUSE would look on-orbit. The telescopes are looking toward the upper right in this picture, and only two of the four telescope doors are visible from this angle. The blue rectangles represent the solar panels, which connect to the spacecraft at the bottom. (Figure courtesy NASA and the FUSE project.)

(Click image above to see larger version.)


June 24th marks the 4-year launch anniversary for FUSE! The FUSE satellite was launched on a Delta-II expendable launch vehicle from Cape Canaveral, Florida, at 11:44 a.m. EDT. To celebrate this anniversary, we provide a "walk down memory lane." Visit the FUSE Launch Archive Site for a retrospective of launch day, from launch press coverage to pictures from KSC and JHU, and even a video of launch!

In other news, our revised flight software load to FUSE, which began on April 16, 2003 (as reported in a previous status report) is now complete. This new FUSE control software will allow us to operate FUSE even as our laser-ring gyroscopes continue to age and fail. Although 5 out of 6 gyros are still operational, all remaining gyros show signs of "age" and additional failures could occur without warning. The new flight software senses these problems when they occur and automatically compensates for any missing gyros. It should be a long time before this happens in reality, but if need be, the new system will work without ANY gyros in the control loop! (We know--we tested it this way and it works!) This says a lot not only about the ingenuity and creativity of our engineers, but about our ability to operate FUSE well into the future.

Speaking of the future, NASA is nearing the release of the Call for a new round of proposals, Cycle 5. Details will be posted soon at the FUSE GI Support Site.

It has been an exciting four years. There have been many ups and downs, but the FUSE project appears poised to continue smooth operations into the Extended Mission phase of the project. Thanks to all who help run the project, and to our user community who continue to pump out an astounding array of scientific results from "the little satellite that could!"

Reported by: Bill Blair, Chief of Observatory Operations

Peruse Previous Status Reports, or Return to the FUSE home page.



FUSE Home Page FUSE Mission Overview FUSE Photo File FUSE Mission Status Public Outreach FUSE Planning Tools FUSE Data Archive